A prison reformed : how can a contemporary architectural intervention be sensitively integrated into a heritage building of heavy masonry construction in order to facilitate its successful reuse?

Loading...
Thumbnail Image
Supplementary material
Other Title
Authors
Phillips, Maria Heather
Author ORCID Profiles (clickable)
Degree
Master of Architecture (Professional)
Grantor
Unitec Institute of Technology
Date
2013
Supervisors
McConchie, Graeme
Type
Masters Thesis
Ngā Upoko Tukutuku (Māori subject headings)
Keyword
adaptive reuse of buildings
Dunedin Prison (N.Z.)
former Dunedin Central Police Station
converted architecture
New Zealand
ANZSRC Field of Research Code (2020)
Citation
Phillips, M. (2013). A prison reformed : how can a contemporary architectural intervention be sensitively integrated into a heritage building of heavy masonry construction in order to facilitate its successful reuse? Unpublished research project submitted in partial fulfillment of the requirements for the degree of Masters of Architecture (Professional).
Abstract
Heritage buildings are a resource that is often overlooked. The adaptive reuse of a building that has become redundant can lead to interesting and unique spaces, while forcing unconventional design decisions due to physical, economic and social constraints. To allow buildings to function with a new programme some level of intervention will be required, whether it be small repairs, large additions or somewhere in between. The question raised is how to make these interventions sensitive and respectful of the building’s initial design and history, while still allowing for a new function to occur. This issue has been debated since the inception of conservation as a separate topic of theory. The site selected to investigate for the sensitive integration of interventions is the former Dunedin Prison and Former Dunedin Central Police Station. Analysis of the buildings’ history, site, context, and social significance and of changing attitudes towards the buildings over time have influenced the selection of the reuse programme and the final design response. The challenge is to permit enough change to allow for a new function adding contemporary elements, while still retaining and understanding of the buildings’ original state.
Publisher
Link to ePress publication
DOI
Copyright holder
Author
Copyright notice
All rights reserved
Copyright license
Available online at