Comparing the performance of design-bid-build (DBB) and design-build (DB) commercial construction projects

Loading...
Thumbnail Image

Supplementary material

Other Title

Authors

Pennington, T.
Kiroff, Lydia

Author ORCID Profiles (clickable)

Degree

Grantor

Date

2025

Supervisors

Type

Conference Contribution - Paper in Published Proceedings

Ngā Upoko Tukutuku (Māori subject headings)

Keyword

New Zealand
design-bid-build
design-build
construction industry
procurement
early contractor involvement (ECI)

Citation

Pennington, T., & Kiroff, L. (2025). Comparing the performance of design-bid-build (DBB) and design-build (DB) commercial construction projects. In V. Vimonsatit, H. Askarinejad, M. Pour, A. Singh, and S. Yazdani (Ed.), Proceedings of International Structural Engineering and Construction: Integrating Technology for Advanced Practices in Structural Engineering and Construction , Vol. 12(1), 1-6. https://doi.org/10.14455/ISEC.2025.12(1).PRO-01

Abstract

The New Zealand commercial construction industry predominantly employs the traditional Design-Bid-Build (DBB) contract process, where design and construction responsibilities are separated. This often results in design errors and omissions, leading to significant cost and schedule overruns. However, the Design-Build (DB) contract process, which integrates design and construction under a single contractor, is gaining traction. In this model, the contractor assumes financial and schedule risks once the client approves the budget. This study employed a multi-case research approach to compare the DBB and DB contract processes. Data were collected from eight projects completed by an Auckland construction company and evaluated against key performance indicators. Additionally, interviews with key stakeholders provided insights into the performance benefits and challenges of each contract process. The findings reveal that stakeholders adhere to familiar contract processes, negatively impacting the industry. The DB process was found to mitigate cost and schedule overruns more effectively than the DBB process. It facilitates early collaboration between the contractor and project team, addressing design errors and buildability issues upfront and ensuring smoother project execution. The DB process is particularly effective for small- to medium-scale, less complex projects, while the DBB process remains suitable for large, complex projects requiring substantial client input during design.

Publisher

International Structural Engineering and Construction Society (ISEC)

Link to ePress publication

DOI

https://doi.org/10.14455/ISEC.2025.12(1).PRO-01

Copyright holder

Authors

Copyright notice

CC BY-NC-ND Attribution-NonCommercial-NoDerivs 4.0 International

Copyright license