Attitudes and perceptions towards early contractor involvement procurement

Loading...
Thumbnail Image

Supplementary material

Other Title

Authors

Francis, Steven
Kiroff, Lydia

Author ORCID Profiles (clickable)

Degree

Grantor

Date

2015-07-08

Supervisors

Type

Conference Contribution - Paper in Published Proceedings

Ngā Upoko Tukutuku (Māori subject headings)

Keyword

design-bid-build
design-build
construction industry
procurement
early contractor involvement (ECI)

Citation

Francis, S., & Kiroff, L. (2015). Attitudes and perceptions towards early contractor involvement procurement. RICS (Ed.), Proceedings of the RICS COBRA AUBEA 2015 conference, ISBN: 978-1-78321-071-8, University of Technology Sydney, Australia (3-16)

Abstract

Early contractor involvement (ECI) procurement is a relatively recent development in construction, which allows the contractor to have input into the design phase of a project. In comparison, under traditional construction procurement, the design is completed before the contractor becomes involved in a project. The aim of the paper is to examine the attitudes and perceptions of contractors and architectural designers towards ECI in general and design-build procurement in particular as the most common form of ECI procurement in the Auckland commercial construction market. Face-to-face surveys and semi-structured interviews have been conducted with contractors and architectural designers to gain an in-depth understanding of the different aspects of ECI procurement, in comparison to traditional design-bid-build procurement with regard to Auckland commercial construction projects. The findings of the study indicate that ECI procurement is viewed positively by both contractors and architectural designers. Both parties also consider that ECI provides benefits for them, though each has some concerns in certain areas of ECI that they feel adversely affect their particular role. These areas of concern are where there are differences in the perceptions of the two parties. ECI was found to offer significant advantages over the traditional approach in terms of cost, design and relationship factors, but results were inconclusive with regard to time and quality advantages.

Publisher

Royal Institution of Chartered Surveyors

Link to ePress publication

DOI

Copyright holder

Royal Institution of Chartered Surveyors

Copyright notice

All rights reserved

Copyright license

Available online at