An assessment of risk factors impacting budget variability in New Zealand commercial construction projects

Loading...
Thumbnail Image
Supplementary material
Other Title
Authors
Adafin, Johnson
Rotimi, J.O.B.
Wilkinson, Suzanne
Mbachu, J.
Author ORCID Profiles (clickable)
Degree
Grantor
Date
2019-09
Supervisors
Type
Conference Contribution - Paper in Published Proceedings
Ngā Upoko Tukutuku (Māori subject headings)
Keyword
New Zealand
construction industry
budget overrun
elemental cost planning
out-turn tender sum
Citation
Adafin, J., Rotimi, J.O.B., Wilkinson, S., & Mbachu, J. (2019). An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In Gorse, C & Nelson, C.J. (Ed.), Proceedings of the 35th Annual ARCOM Conference (pp. 44-53).
Abstract
A review of several authors shows that various risk factors abound which potentially impact on the outturn tender sums (OTS) of construction projects from the design stage elemental cost plans (ECPs)/budget estimates. Proper risk analysis could at least partially solve this problem, by lowering the variation between the design-stage ECPs and their OTS. The concern of the current study is the variability between design-stage ECP and OTS, whereas the conjecture is that risk could be responsible for the observed variability. Empirical data was obtained from 208 practising New Zealand (NZ) construction consultants through an online survey. A quantitative analysis was performed to determine the most critical risk factors that impact ECPs. Findings revealed variation between ECPs and OTS (inflated risks) within the region of +1% and 23.86%. These verify discrepancies in the budgeted costs of commercial projects at preconstruction phase, and the risk factors responsible should be the initial focus of construction project consultants. The research provides invaluable insights from practice that could propose and strengthen the development of an effective mitigation strategy by using risk management approach which promotes risk/cost management integration in project delivery for the construction industry. This study therefore attempts to influence government policy to develop support mechanisms to encourage effective risk management practice in the construction industry in NZ.
Publisher
Link to ePress publication
DOI
Copyright holder
Authors
Copyright notice
"All authors of papers published in the ARCOM Conferences retain the right to re-publish their work in any format without the need for further permission from ARCOM. This includes depositing the final published pdf version of papers on Universities' Institutional Repositories. However, we ask that authors acknowledge that the original paper was first published by ARCOM as part of the Conference Proceedings and, if possible, to provide a direct link to the full paper as archived on the ARCOM CM Abstracts database"--http://www.arcom.ac.uk/copyright.php
Copyright license
Available online at