    Current and anticipated future impacts of BIM on cost modelling in Auckland

    Stanley, Ryan; Thurnell, Derek

    Thumbnail
    Share
    View fulltext online
    Stanley & Thurnell (2013)-AUBEA.pdf (358.8Kb)
    Date
    2013
    Citation:
    Stanley, R., Thurnell, D. (2013). Current and anticipated future impacts of BIM on cost modelling in Auckland. In Proceedings of the 38th Australasian Universities Building Education Association Conference, 20-22 November 2013, Auckland, New Zealand,
    Permanent link to Research Bank record:
    https://hdl.handle.net/10652/2450
    Abstract
    5D Building Information Modelling (BIM) models contain data consisting of 3D objects which also include information relating to construction scheduling and cost aspects, and has the potential to be used by quantity surveyors (QSs) for such tasks as quantity take-offs, estimation and cost management (i.e. cost modelling), in a collaborative project environment with design team members such as architects and engineers. A ‘snapshot’ of 5D BIM use in Auckland is presented, based on structured interviews which gained the perceptions of 8 QSs, on both the current and likely future impacts of 5D BIM on cost modelling. Results suggest that in Auckland there is currently a low level of engagement with 5D BIM, and thus it has a low impact, although a small number of QSs indicate they are already using 5D BIM in a limited manner for some aspects of cost modelling. Most QSs interviewed thought that 5D BIM would have an extremely significant impact in the future, as the process becomes more prevalent.
    Keywords:
    BIM (building information modelling), cost modelling, design stage estimating, quantity surveying
    ANZSRC Field of Research:
    120201 Building Construction Management and Project Planning
    Copyright Holder:
    Australasian Universities Building Education Association

    Copyright Notice:
    All rights reserved
    Available Online at:
    http://www.aubea2013.org.nz/
    Rights:
    This digital work is protected by copyright. It may be consulted by you, provided you comply with the provisions of the Act and the following conditions of use. These documents or images may be used for research or private study purposes. Whether they can be used for any other purpose depends upon the Copyright Notice above. You will recognise the author's and publishers rights and give due acknowledgement where appropriate.
    Metadata
    Show detailed record
    This item appears in
    • Construction + Engineering Conference Papers [211]

    Te Pūkenga

    Research Bank is part of Te Pūkenga - New Zealand Institute of Skills and Technology

    • About Te Pūkenga
    • Privacy Notice

    Copyright ©2022 Te Pūkenga

    Usage

    Downloads, last 12 months
    41
     
     

    Usage Statistics

    For this itemFor the Research Bank

    Share

    About

    About Research BankContact us

    Help for authors  

    How to add research

    Register for updates  

    LoginRegister

    Browse Research Bank  

    EverywhereInstitutionsStudy AreaAuthorDateSubjectTitleType of researchSupervisorCollaboratorThis CollectionStudy AreaAuthorDateSubjectTitleType of researchSupervisorCollaborator

    Te Pūkenga

    Research Bank is part of Te Pūkenga - New Zealand Institute of Skills and Technology

    • About Te Pūkenga
    • Privacy Notice

    Copyright ©2022 Te Pūkenga